zawaya almodon Company For Improvement and Development
Account Verified
Membership Number
2074207435
Membership
Saudi Contractor
Member Since
2026/07/28
Company Size
Very Small Company Size
Training credit hours
0 h
Organization Mobile Number
Organization Email
City
AL MADINAH AL MUNAWWARAH
Region
Madinah
Contract Request
To preserve the rights of all parties in the contractual relationship, the Saudi Contractors Authority provides 36 approved and documented model contracts, one of which can be chosen below.
توثيق المقاولين ومستوى الجاهزية
| الأنشطة الموثقة | مستوى الجاهزية |
|---|
| # | الإسم |
|---|
| # | الإسم |
|---|
Interests
- Waste collection, treatment & disposal activities; materials recovery
- Collection of non-hazardous waste
- Transfer of municipal waste
- Collection of recyclable materials
- Transportation of non-hazardous industrial waste
- Used cooking oil collection
- Collection of hazardous waste
- Collection of hazardous waste, such as used oil from shipment or garages
- Collection of hazardous waste, such as bio-hazardous waste
- Collection of hazardous waste, such as used batteries
- Operation of waste transfer stations for hazardous waste
- Construction of buildings
- Construction of buildings
- Construction of all types of residential buildings
- Construction of all types of non-residential buildings including schools, hospitals, hotels … etc.
- Construction of all types of non-residential buildings such as airport buildings
- Construction of all types of non-residential steel buildings
- Erection of prefabricated constructions on the site
- Remodeling or renovating existing residential and non- residential structures
- Specialized construction activities
- Demolition
- Demolition or wrecking of buildings and other structures
- Site preparation
- Drilling and earth moving for site preparation purposes
- Landfill
- Building site drainage
- Blasting
- Electrical installation
- Electrical wiring
- Plumbing, heat and air-conditioning installation
- Installation, maintenance and repair of plumbing and sanitary equipment
- Installation, maintenance and repair of refrigeration or air-conditioning equipment
- Building completion and finishing
- Building finishing
- Installation of ceramic
- Installation of marble
- Installation of cut stone tiles
- Cleaning of new buildings after construction
- Clearing and polishing tiles and marble
- Other specialized construction activities
- Bricklaying
- Scaffolds erecting
- Water supply, sanitation activities, and waste management and treatment
- Sanitation
- Wastewater collection and transport
- Operation of wastewater treatment networks and facilities