مستوي
الجاهزية
الجاهزية
Nesma International Water & Energy Technology Ltd. Co
Account Verified
Membership Number
100005482
Membership
Saudi Contractor
Member Since
2019/03/27
Company Size
Medium Company Size
Training credit hours
74 h
Organization Mobile Number
0122346213
Organization Email
City
JEDDAH
Region
Makkah
Address
6989 Abi Al Abbas Al Qadsi - Al Basatin Dist.
Unit No 33
Jeddah 23719 - 4232
Kingdom of Saudi Arabia
Contract Request
To preserve the rights of all parties in the contractual relationship, the Saudi Contractors Authority provides 36 approved and documented model contracts, one of which can be chosen below.
التراخيص ومستوى الجاهزية
| الأنشطة المرخصة | مستوى الجاهزية |
|---|---|
|
الهندسة المدنية - إنشاء مشاريع المرافق - المياه والصرف الصحي
Civil Engineering - Construction of Utility Projects – Water & Sewage
|
ماسي
| Dimond
|
|
التشغيل والصيانة - إدارة المرافق المتكاملة
Operations and Maintenance Activities - Integrated Facility Management
|
فضي
| Silver
|
|
الهندسة المدنية - تجميع المياه ومعالجتها وتوصيلها
Civil Engineering -
|
فضي
| Silver
|
|
تشييد المباني - تشييد المباني - جميع الأنواع
Construction of Buildings - Construction of Buildings – All Types
|
شركة نسما العالمية لتقنيات المياه والطاقة المحدودة
6989 Abi Al Abbas Al Qadsi - Al Basatin Dist.
Unit No 33
Jeddah 23719 - 4232
Kingdom of Saudi Arabia
| # | الإسم |
|---|
| # | الإسم |
|---|
Interests
- Construction of buildings
- Construction of buildings
- Construction of all types of non-residential steel buildings
- Civil engineering
- Construction of roads and railways
- Construction and repair of motorways, streets, roads, other vehicular and pedestrian ways
- Construction and repair of bridges or tunnels
- Construction of utility projects
- Long-distance oil and gas pipelines
- Construction and repair of sewer systems, sewage disposal plants and pumping stations
- Construction, erection and repair of power plants
- Specialized construction activities
- Site preparation
- Drilling and earth moving for site preparation purposes
- Building site drainage