استبدال محولات كهربائية
شركة
رقم المشروع : #7845
تفاصيل المشروع
تبديل المحولات الكهربائية
قائمة الاعمال المطلوبة موجودة فالمرفقات
Providing engineering consultations and coordinate with the Saudi Electricity Company for disconnection and installation
Removal of the 1500 KVA unit station, separating all low and medium voltage cables and the cable between the transformer and the ring cell.
Supply and installation of a Unit station with a capacity of 1500 KVA, including installation of the ground network and adjustment of protection
Supply and installation of a copper terminal size 1*630 mm
Supply and extend of a single cable, size 1*630 mm low voltage copper 1 kV
Supply and installation of a ground network, including installation of ground bars and ground resistance testing
متطلبات المشروع
تبديل المحولات الكهربائية قائمة الاعمال المطلوبة موجودة فالمرفقات